Project Details
This page displays current information for project DEA: 07342804.
Project Information
Project Identifiers | Project ID: 994093 DEA: 07342804 EFIS: 0717000331 |
---|---|
DIST-CO-RTE-PM | 07-LA-14-R27.0/R28.1 |
Award Date | 09/21/2022 |
Closeout Date | 09/24/2024 |
Work Description | CONSTRUCT CATCHMENT WALL, ROCK SCALING AND CONCRETE BARRIER. |
Location Description | LOS ANGELES COUNTY IN SANTA CLARITA FROM THE NEWHALL AVENUE UNDERCROSSING TO 0.1 MILE SOUTH OF PLACERITA CANYON ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 09/20/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ali.mohsenzadeh@dot.ca.gov | Ali MOHSENZADEH | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 57 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-05-22-117 | 05/22/2023 | 05/23/2023 | Quality Control | Concrete | View |
2023-05-22-118 | 05/22/2023 | 05/23/2023 | Quality Control | Concrete | View |
2023-05-26-58 | 05/26/2023 | 05/26/2023 | Quality Control | Aggregate | View |
2023-05-26-72 | 05/26/2023 | 05/27/2023 | Quality Control | Concrete | View |
2023-06-01-93 | 06/01/2023 | 06/01/2023 | Quality Control | Concrete | View |
2023-06-01-113 | 06/01/2023 | 06/01/2023 | Quality Control | Aggregate | View |
2023-06-02-70 | 06/02/2023 | 06/02/2023 | Quality Control | Aggregate | View |
2023-06-05-78 | 06/05/2023 | 06/05/2023 | Quality Control | Aggregate | View |
2023-06-05-79 | 06/05/2023 | 06/06/2023 | Quality Control | Concrete | View |
2023-06-06-90 | 06/06/2023 | 06/06/2023 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods