Project Details
This page displays current information for project DEA: 051P0304.
Project Information
Project Identifiers | Project ID: 993962 DEA: 051P0304 EFIS: 0521000159 |
---|---|
DIST-CO-RTE-PM | 05-SLO-1-62.5/62.5 |
Award Date | 08/02/2021 |
Closeout Date | 03/28/2023 |
Work Description | Line corrugated pipe. Repair sinkhole, restore failed highway enbankment and restore section of trail which will be removed during construction. Provide temp traffic control |
Location Description | Not set |
QA Service Level | 1 (Verified on 06/17/2022) |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods