Project Details
This page displays current information for project DEA: 071XY804.
Project Information
Project Identifiers | Project ID: 993911 DEA: 071XY804 EFIS: 0722000229 |
---|---|
DIST-CO-RTE-PM | 07-LA/LA-47-RO 42/1.98 |
Award Date | 03/14/2022 |
Closeout Date | 04/24/2024 |
Work Description | Fabricate and paint metal cable guards and install them onto the main cables of the Vincent Thomas Bridge |
Location Description | Not set |
QA Service Level | 1 (Verified on 07/22/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
thang.ton@dot.ca.gov | Thang Ton | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-07-24-1 | 07/24/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods