Project Details
This page displays current information for project DEA: 034H5814.
Project Information
Project Identifiers | Project ID: 993905 DEA: 034H5814 EFIS: 0320000240 |
---|---|
DIST-CO-RTE-PM | 03-SAC-5-27.6/29.5,30.4/34.3 |
Award Date | 02/28/2023 |
Closeout Date | Not set |
Work Description | ROADWAY EXCAVATION, PLACE CL2 AB, HMA & RHMA, & MODIFY RAMP METERS. |
Location Description | SACRAMENTO COUNTY IN AND NEAR SACRAMENTO FROM 0.5 MILES SOUTH OF ARENA BOULEVARD OVERCROSSING TO 0.4 MILES SOUTH OF 99/5 INTERCHANGE AND FROM 0.5 MILES NORTH OF THE 99/5 INTERCHANGE TO 0.4 MILE SOUTH OF THE YOLO COUNTY LINE |
QA Service Level | 1 (Verified on 06/27/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
hani.eissa@dot.ca.gov | Hani Eissa | Resident Engineer | Caltrans RE DB |
brent_bullard@dot.ca.gov | Brent Bullard | Structural Representative | Caltrans SR DB |
mihai.hantelmann@dot.ca.gov | Mihai Hantelmann | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 149 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-07-24-49 | 07/24/2024 | 07/31/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-07-23-85 | 07/23/2024 | 07/31/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-07-24-48 | 07/24/2024 | 07/31/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-07-23-84 | 07/23/2024 | 07/31/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-07-19-41 | 07/19/2024 | 07/26/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-07-17-85 | 07/17/2024 | 07/26/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-07-17-84 | 07/17/2024 | 07/26/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-07-18-65 | 07/18/2024 | 07/26/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-07-24-36 | 07/24/2024 | 08/12/2024 | Verification | Asphalt Binder | View |
2024-07-23-58 | 07/23/2024 | 08/12/2024 | Quality Assurance | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods