Project Details
This page displays current information for project DEA: 120R5604.
Project Information
Project Identifiers | Project ID: 993870 DEA: 120R5604 EFIS: 1218000117 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5,55,73,91,133,405-var |
Award Date | 04/12/2023 |
Closeout Date | Not set |
Work Description | PLACE RHMA-G, HMA, SLAB REPLACEMENT AND JPCP. |
Location Description | ORANGE COUNTY AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 06/14/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
roy.rivera@dot.ca.gov | Roy Rivera | Resident Engineer | Caltrans RE DB |
vian.ghazi@dot.ca.gov | Vian Ghazi | Structural Representative | Caltrans SR DB |
anouar.kartite@dot.ca.gov | Anouar Kartite | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 98 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-07-15-57 | 07/15/2025 | 07/15/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-06-16-75 | 06/16/2025 | 06/16/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-05-05-91 | 05/05/2025 | 05/05/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-07-10-59 | 07/10/2025 | 07/10/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-07-09-61 | 07/09/2025 | 07/09/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-07-08-36 | 07/08/2025 | 07/08/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-07-14-21 | 07/14/2025 | 07/14/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-07-09-47 | 07/09/2025 | 07/09/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-07-08-31 | 07/08/2025 | 07/08/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-07-02-20 | 07/02/2025 | 07/02/2025 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods