Project Details
This page displays current information for project DEA: 050C7324.
Project Information
Project Identifiers | Project ID: 993868 DEA: 050C7324 EFIS: 0512000228 |
---|---|
DIST-CO-RTE-PM | 05-SCR-1-13.4/14.9 |
Award Date | 10/14/2022 |
Closeout Date | Not set |
Work Description | CONSTRUCT PEDESTRIAN OVERCROSSING AND AUXILIARY LANE. |
Location Description | SANTA CRUZ COUNTY IN AND NEAR CITY OF CAPITOLA FROM 0.2 MILE SOUTH OF 41ST AVENUE OVERCROSSING TO 0.2 MILE NORTH OF SOQUEL DRIVE OVERCROSSING |
QA Service Level | 1 (Verified on 06/17/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Gareth.Gill@dot.ca.gov | Gareth Gill | Resident Engineer | Caltrans RE DB |
jorge.uberhuaga@dot.ca.gov | Jorge Uberhuaga | Structural Representative | Caltrans SR DB |
kevin.couch@dot.ca.gov | Kevin Couch | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 78 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-11-29-23 | 11/29/2023 | 12/01/2023 | Quality Assurance | Concrete | View |
2023-11-22-13 | 11/22/2023 | 11/27/2023 | Quality Assurance | Concrete | View |
2023-11-03-18 | 11/03/2023 | 11/06/2023 | Quality Assurance | Concrete | View |
2023-10-20-74 | 10/20/2023 | 10/23/2023 | Quality Assurance | Concrete | View |
2023-10-11-46 | 10/11/2023 | 10/12/2023 | Quality Assurance | Concrete | View |
2023-10-03-21 | 10/03/2023 | 10/03/2023 | Quality Control | Concrete | View |
2023-10-02-31 | 10/02/2023 | 10/03/2023 | Quality Assurance | Concrete | View |
2023-09-27-36 | 09/27/2023 | 09/29/2023 | Quality Assurance | Concrete | View |
2023-09-27-49 | 09/27/2023 | 09/27/2023 | Quality Control | Concrete | View |
2023-09-25-43 | 09/25/2023 | 09/26/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-10 of 36 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
SCS-EPD-06643 | Carbon Steel Rebar | EVRAZ North America | CMC Rebar (Maria Sanchez) | 3,179 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Mesa | CMC Rebar (TAMMY ARAGON) | 7313 lb |
EPD-191 | Carbon Steel Rebar | CMC - Mesa | CMC Rebar (TAMMY ARAGON) | 208 lbs |
EPD-191 | Carbon Steel Rebar | CMC - Mesa | CMC Rebar (TAMMY ARAGON) | 6391 lbs |
EPD-191 | Carbon Steel Rebar | CMC - Mesa | CMC Rebar (TAMMY ARAGON) | 1093 lbs |
EPD-191 | Carbon Steel Rebar | CMC - Mesa | CMC Rebar (TAMMY ARAGON) | 15582 lb |
EPD-191 | Carbon Steel Rebar | CMC - Mesa | CMC Rebar (TAMMY ARAGON) | 14063 lb |
EPD-191 | Carbon Steel Rebar | CMC - Mesa | CMC Rebar (TAMMY ARAGON) | 6779 lb |
EPD-191 | Carbon Steel Rebar | CMC - Mesa | CMC Rebar (TAMMY ARAGON) | 16675 lbs |
EPD-191 | Carbon Steel Rebar | CMC - Mesa | CMC Rebar (TAMMY ARAGON) | 660 lbs |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods