Project Details

This page displays current information for project DEA: 042J7304.

Project Information

Project IdentifiersProject ID: 993856
DEA: 042J7304
EFIS: 0415000004
DIST-CO-RTE-PM04-SM-101-6.7/7.6
Award Date03/20/2023
Closeout DateNot set
Work DescriptionSM 101 Cordilleras Crk Br Replacement
Location DescriptionNot set
QA Service Level1 (Verified on 06/27/2022)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
peter.lam@dot.ca.govPeter LamResident EngineerCaltrans RE DB
tyler.pinell@dot.ca.govTyler PinellStructural RepresentativeCaltrans SR DB
saman.barzegari@dot.ca.govSaman BarzegariMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 51-60 of 66 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2023-09-06-6309/06/202309/06/2023Quality ControlConcreteView
2023-09-06-6209/06/202309/06/2023Quality ControlConcreteView
2023-09-06-6109/06/202309/06/2023Quality ControlConcreteView
2023-09-06-6009/06/202309/06/2023Quality ControlConcreteView
2023-08-31-5408/31/202308/31/2023Quality ControlConcreteView
2023-08-31-5308/31/202308/31/2023Quality ControlConcreteView
2023-08-31-5208/31/202308/31/2023Quality ControlConcreteView
2023-08-31-5108/31/202308/31/2023Quality ControlConcreteView
2023-09-11-1009/11/202309/12/2023Quality AssuranceSMTL TM5 - CouplersView
2023-08-14-6908/14/202308/25/2023Quality AssuranceSMTL TM5 - CouplersView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Displaying 1-10 of 18 results.
Declaration NumberMaterial TypeVendorSubmitted byQuantity
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)12161 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)163 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)14368 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)7405 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)11348 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)25388 L
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)19209 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)8364 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)1070 LBS
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)1198 LBS

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods