Project Details
This page displays current information for project DEA: 042J7304.
Project Information
Project Identifiers | Project ID: 993856 DEA: 042J7304 EFIS: 0415000004 |
---|---|
DIST-CO-RTE-PM | 04-SM-101-6.7/7.6 |
Award Date | 03/20/2023 |
Closeout Date | Not set |
Work Description | SM 101 Cordilleras Crk Br Replacement |
Location Description | Not set |
QA Service Level | 1 (Verified on 06/27/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
peter.lam@dot.ca.gov | Peter Lam | Resident Engineer | Caltrans RE DB |
tyler.pinell@dot.ca.gov | Tyler Pinell | Structural Representative | Caltrans SR DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 66 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-09-27-39 | 09/27/2023 | 09/27/2023 | Quality Control | Concrete | View |
2023-09-21-68 | 09/21/2023 | 09/21/2023 | Quality Control | Concrete | View |
2023-09-21-67 | 09/21/2023 | 09/21/2023 | Quality Control | Concrete | View |
2023-09-21-66 | 09/21/2023 | 09/21/2023 | Quality Control | Concrete | View |
2023-09-21-65 | 09/21/2023 | 09/21/2023 | Quality Control | Concrete | View |
2023-09-19-39 | 09/19/2023 | 09/19/2023 | Quality Control | Concrete | View |
2023-09-19-38 | 09/19/2023 | 09/19/2023 | Quality Control | Concrete | View |
2023-09-19-37 | 09/19/2023 | 09/19/2023 | Quality Control | Concrete | View |
2023-09-19-36 | 09/19/2023 | 09/19/2023 | Quality Control | Concrete | View |
2023-09-19-35 | 09/19/2023 | 09/19/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-10 of 18 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | C&N Reinforcing (Dawnette Galicia) | 12161 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | C&N Reinforcing (Dawnette Galicia) | 163 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | C&N Reinforcing (Dawnette Galicia) | 14368 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | C&N Reinforcing (Dawnette Galicia) | 7405 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | C&N Reinforcing (Dawnette Galicia) | 11348 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | C&N Reinforcing (Dawnette Galicia) | 25388 L |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | C&N Reinforcing (Dawnette Galicia) | 19209 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | C&N Reinforcing (Dawnette Galicia) | 8364 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | C&N Reinforcing (Dawnette Galicia) | 1070 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | C&N Reinforcing (Dawnette Galicia) | 1198 LBS |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods