Project Details
This page displays current information for project DEA: 070W0704.
Project Information
Project Identifiers | Project ID: 993828 DEA: 070W0704 EFIS: 0721000031 |
---|---|
DIST-CO-RTE-PM | 07-LA-710-6.9/17.3 |
Award Date | 06/27/2022 |
Closeout Date | 10/02/2023 |
Work Description | INDIVIDUAL SLAB REPLACEMENT. |
Location Description | LOS ANGELES COUNTY IN AND NEAR LONG BEACH FROM ROUTE 1/710 SEPARATION TO LOS ANGELES RIVER BRIDGE |
QA Service Level | 1 (Verified on 05/11/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jose.ferrer@dot.ca.gov | Jose FERRER | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 36 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-05-21-9 | 05/21/2023 | 05/23/2023 | Department Acceptance | Aggregate | View |
2023-05-14-9 | 05/14/2023 | 05/16/2023 | Department Acceptance | Aggregate | View |
2023-05-12-101 | 05/12/2023 | 05/17/2023 | Department Acceptance | Aggregate | View |
2023-05-12-100 | 05/12/2023 | 05/17/2023 | Department Acceptance | Aggregate | View |
2023-05-21-2 | 05/21/2023 | 05/21/2023 | Department Acceptance | Concrete | View |
2023-05-14-5 | 05/14/2023 | 05/14/2023 | Department Acceptance | Concrete | View |
2023-03-26-6 | 03/26/2023 | 03/30/2023 | Department Acceptance | Aggregate | View |
2023-03-12-2 | 03/12/2023 | 03/15/2023 | Department Acceptance | Aggregate | View |
2023-03-26-1 | 03/26/2023 | 03/27/2023 | Department Acceptance | Hot Mix Asphalt | View |
2023-03-12-1 | 03/12/2023 | 03/13/2023 | Department Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods