Project Details
This page displays current information for project DEA: 07353304.
Project Information
| Project Identifiers | Project ID: 993807 DEA: 07353304 EFIS: 0718000272 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-110-23.1 |
| Award Date | 11/03/2022 |
| Closeout Date | 09/24/2024 |
| Work Description | REPLACE BRIDGE RAILING WITH CONCRETE BARRIER. AND UPGRADE LIGHTING. |
| Location Description | LOS ANGELES COUNTY IN LOS ANGELES AT THIRD STREET OVERCROSSING |
| QA Service Level | 1 (Verified on 05/11/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Edgar.Herrera@dot.ca.gov | Edgar Herrera | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 39 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-09-29-40 | 09/29/2023 | 09/29/2023 | Department Acceptance | Polyester | View |
| 2023-09-07-54 | 09/07/2023 | 09/19/2023 | Department Acceptance | Hot Mix Asphalt | View |
| 2023-07-28-59 | 07/28/2023 | 08/09/2023 | Department Acceptance | Concrete | View |
| 2023-08-16-3 | 08/16/2023 | 08/16/2023 | Department Acceptance | Aggregate | View |
| 2023-08-16-2 | 08/16/2023 | 08/16/2023 | Department Acceptance | Aggregate | View |
| 2023-08-16-1 | 08/16/2023 | 08/16/2023 | Department Acceptance | Aggregate | View |
| 2023-08-10-43 | 08/10/2023 | 08/10/2023 | Department Acceptance | Aggregate | View |
| 2023-08-10-42 | 08/10/2023 | 08/10/2023 | Department Acceptance | Aggregate | View |
| 2023-08-10-41 | 08/10/2023 | 08/10/2023 | Department Acceptance | Aggregate | View |
| 2023-05-16-99 | 05/16/2023 | 05/17/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
