Project Details
This page displays current information for project DEA: 032G3704.
Project Information
Project Identifiers | Project ID: 993801 DEA: 032G3704 EFIS: 0321000118 |
---|---|
DIST-CO-RTE-PM | 03-COL,YOL-16-0.1/7.3,0.0/0.7 |
Award Date | 06/27/2022 |
Closeout Date | 07/26/2023 |
Work Description | PARTIAL DEPTH RECYCLING, PLACE RHMA-G, & COLD PLANE AC PAVEMENT. |
Location Description | COLUSA AND YOLO COUNTIES NEAR RUMSEY FROM 0.1 MILE SOUTH OF ROUTE 20 TO 1.3 MILES NORTH OF ROAD 40 |
QA Service Level | 1 (Verified on 05/09/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Masoud.Saed@dot.ca.gov | Masoud Saed | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 41-49 of 49 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-09-08-23 | 09/08/2022 | 09/12/2022 | Acceptance | Asphaltic Emulsion | View |
2022-09-08-24 | 09/08/2022 | 09/12/2022 | Acceptance | Asphaltic Emulsion | View |
2022-09-08-25 | 09/08/2022 | 09/12/2022 | Acceptance | Asphaltic Emulsion | View |
2022-09-08-26 | 09/08/2022 | 09/12/2022 | Acceptance | Asphaltic Emulsion | View |
2022-09-07-43 | 09/07/2022 | 09/12/2022 | Acceptance | Asphaltic Emulsion | View |
2022-08-26-19 | 08/26/2022 | 08/26/2022 | Acceptance | Asphalt Binder | View |
2022-08-25-41 | 08/25/2022 | 08/26/2022 | Acceptance | Asphalt Binder | View |
2022-08-24-20 | 08/24/2022 | 08/24/2022 | Acceptance | Asphalt Binder | View |
2022-08-24-25 | 08/24/2022 | 08/25/2022 | Acceptance | Asphaltic Emulsion | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods