Project Details
This page displays current information for project DIME:993795.
Project Information
Project Identifiers | Project ID: 993795 Permit Numbers: 06206CD0429 06216RW1282 06226RW0459 06226RT0460 |
---|---|
DIST-CO-RTE-PM | 06---8.07/8.069 |
Award Date | 05/01/2020 |
Closeout Date | 05/13/2024 |
Work Description | Street improvements and storm drain construction on State Route 145 for a commercial development. |
Location Description | NEC SR 145 and Pecan (Avenue 13), Madera |
QA Service Level | 1 (Verified on 04/20/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods