Project Details
This page displays current information for project DEA: 042W5404.
Project Information
Project Identifiers | Project ID: 993778 DEA: 042W5404 EFIS: 0421000234 |
---|---|
DIST-CO-RTE-PM | 04-MRN-101-4.0/4.6 |
Award Date | 06/21/2022 |
Closeout Date | 02/16/2024 |
Work Description | PLACE POLYESTER CONCRETE OVERLAY. |
Location Description | MARIN COUNTY NEAR SAUSALITO FROM 0.7 MILE NORTH OF WALDO UNDERCROSSING TO 0.2 MILE SOUTH OF FRONTAGE ROAD |
QA Service Level | 1 (Verified on 05/19/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-07-05-37 | 07/05/2023 | 07/06/2023 | Quality Control | Polyester | View |
2023-06-15-25 | 06/15/2023 | 06/16/2023 | Quality Control | Polyester | View |
2023-06-13-61 | 06/13/2023 | 06/14/2023 | Quality Control | Polyester | View |
2023-04-20-31 | 04/20/2023 | 04/21/2023 | Quality Control | Polyester | View |
2022-11-29-30 | 11/29/2022 | 11/30/2022 | Quality Control | Polyester | View |
2022-10-19-27 | 10/19/2022 | 10/19/2022 | Quality Control | Polyester | View |
2022-09-29-16 | 09/29/2022 | 09/29/2022 | Quality Control | Polyester | View |
2022-08-24-29 | 08/24/2022 | 08/25/2022 | Quality Control | Polyester | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods