Project Details
This page displays current information for project DEA: 010G1404.
Project Information
| Project Identifiers | Project ID: 993715 DEA: 010G1404 EFIS: 0116000129 |
|---|---|
| DIST-CO-RTE-PM | 01-HUM-96,169-VAR |
| Award Date | 11/16/2022 |
| Closeout Date | 06/16/2025 |
| Work Description | HUM 96-169 5 Bridges Rail Upgrade (Do not include in project name: STRUCTURAL STEEL, CONCRETE BARRIER, POLYESTER CONCRETE OVERLAY) |
| Location Description | HUMBOLDT COUNTY ON ROUTES 96 AND 169 AT VARIOUS LOCATIONS (Bridge Nos. 04-0215, 04-0059, 04-0063, 04-0225, 04-0061) |
| QA Service Level | 1 (Verified on 04/19/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Efren.Banuelos@dot.ca.gov | Efren Banuelos | Resident Engineer | Caltrans RE DB |
| Laura.cangas@dot.ca.gov | Laura Cangas | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 65 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-08-04-46 | 08/04/2023 | 08/05/2023 | Quality Assurance | Concrete | View |
| 2023-08-04-48 | 08/04/2023 | 08/05/2023 | Quality Assurance | Concrete | View |
| 2023-08-07-45 | 08/07/2023 | 08/08/2023 | Quality Assurance | Concrete | View |
| 2023-08-08-39 | 08/08/2023 | 08/09/2023 | Quality Assurance | Concrete | View |
| 2023-08-10-39 | 08/10/2023 | 08/09/2023 | Quality Assurance | Concrete | View |
| 2023-08-10-47 | 08/10/2023 | 08/11/2023 | Quality Assurance | Concrete | View |
| 2023-08-14-44 | 08/14/2023 | 08/15/2023 | Quality Assurance | Concrete | View |
| 2023-09-13-26 | 09/13/2023 | 09/15/2023 | Quality Assurance | Concrete | View |
| 2023-09-20-7 | 09/20/2023 | 09/25/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
| 2023-09-20-8 | 09/20/2023 | 09/25/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
