Project Details
This page displays current information for project DEA: 042Q8004.
Project Information
Project Identifiers | Project ID: 993678 DEA: 042Q8004 EFIS: 0419000050 COOP: 042836,042944 |
---|---|
DIST-CO-RTE-PM | 04-SM-101,92-US 101 & SR 92-10.9/12.1 & 11.8/13.4 |
Award Date | 01/22/2025 |
Closeout Date | Not set |
Work Description | US 101/SR 92 INTERCHANGE AREA IMPROVEMENT :PROJECT WILL CONSTRUCT CONGESTION RELIEF IMPROVEMENTS AT THE US 101/SR 92 INTERCHANGE AREA. |
Location Description | |
QA Service Level | 1 (Verified on 09/15/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mohamed.fouad@dot.ca.gov | Mohamed Fouad | Resident Engineer | Caltrans RE DB |
bryan.nagid@dot.ca.gov | Bryan Nagid | Structural Representative | Caltrans SR DB |
waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 17 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-05-19-6 | 05/19/2025 | 05/21/2025 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2025-05-22-4 | 05/22/2025 | 05/27/2025 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2025-06-11-65 | 06/11/2025 | 06/11/2025 | Quality Assurance | Soil | View |
2025-07-03-1 | 07/03/2025 | 07/08/2025 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2025-07-03-2 | 07/03/2025 | 07/08/2025 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2025-07-07-18 | 07/07/2025 | 07/07/2025 | Quality Assurance | Soil | View |
2025-07-10-1 | 07/10/2025 | Quality Assurance | SMTL TM5 - Welded Hoops | View | |
2025-05-22-6 | 05/22/2025 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2025-06-20-27 | 06/20/2025 | 06/20/2025 | Quality Control | Aggregate | View |
2025-06-20-28 | 06/20/2025 | 06/20/2025 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods