Project Details
This page displays current information for project DIME:993657.
Project Information
Project Identifiers | Project ID: 993657 Permit Numbers: 04206MC2436 04216RW0994 04216RT1806 04216RW3013 04216RT3202 04226RT0391 04216RW1010 04216RW3271 04226RT0861 |
---|---|
DIST-CO-RTE-PM | 04---7.52 |
Award Date | 11/01/2020 |
Closeout Date | Not set |
Work Description | The project proposed to replace existing curb,gutter,and sidewalk along the frontage of the project on El Camino Real. |
Location Description | 1300 El Camino Real, Belmont |
QA Service Level | 1 (Verified on 03/23/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
George.Lee@dot.ca.gov | George Lee | Resident Engineer | Caltrans RE DB |
waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods