Project Details
This page displays current information for project DEA: 112N0874.
Project Information
Project Identifiers | Project ID: 993629 DEA: 112N0874 EFIS: 1119000220 |
---|---|
DIST-CO-RTE-PM | 11-SD-5,15,76,78-Var |
Award Date | 05/27/2022 |
Closeout Date | 02/27/2024 |
Work Description | PPLY METHACRYLATE, PLACE POLYESTER CONCRETE OVERLAY Apply Methacrylate on bridge deck |
Location Description | SAN DIEGO COUNTY AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 03/21/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Ali.Demir@dot.ca.gov | Ali Demir | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-4 of 4 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-07-19-51 | 07/19/2023 | 07/20/2023 | Quality Assurance | Aggregate | View |
2023-07-19-50 | 07/19/2023 | 07/20/2023 | Quality Assurance | Hot Mix Asphalt | View |
2022-11-10-38 | 11/10/2022 | 11/11/2022 | Quality Control | Polyester | View |
2022-09-07-38 | 09/07/2022 | 09/07/2022 | Quality Control | Methacrylate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods