Project Details
This page displays current information for project DEA: 081H8204.
Project Information
Project Identifiers | Project ID: 993608 DEA: 081H8204 EFIS: 0817000138 |
---|---|
DIST-CO-RTE-PM | 08-SBD-15,138-R21.6,R14.8/R15.1 |
Award Date | 08/26/2022 |
Closeout Date | 03/28/2024 |
Work Description | SIGNAL AND LIGHTING SYSTEM, HMA, JPCP, AND ROADWAY EXCAVATION. |
Location Description | SAN BERNARDINO COUNTY IN PHELAN ON ROUTE 138 FROM 0.3 MILE WEST OF ROUTE 138/15 SEPARATION TO ROUTE 138/15 SEPARATION AND ON ROUTE 15 SOUTHBOUND EXIT RAMP AT ROUTE 138 |
QA Service Level | 1 (Verified on 11/16/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
vu.thanh.nguyen@dot.ca.gov | Vu Thanh Nguyen | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 11-16 of 16 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-06-26-44 | 06/26/2023 | 06/28/2023 | Department Acceptance | Hot Mix Asphalt | View |
2023-06-24-6 | 06/24/2023 | 06/28/2023 | Department Acceptance | Hot Mix Asphalt | View |
2023-06-23-29 | 06/23/2023 | 06/27/2023 | Verification | Aggregate | View |
2023-04-20-9 | 04/20/2023 | 04/20/2023 | Quality Assurance | Soil | View |
2023-02-16-48 | 02/16/2023 | 03/02/2023 | Verification | Asphalt Binder | View |
2023-02-16-38 | 02/16/2023 | 03/02/2023 | Verification | Aggregate | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods