Project Details
This page displays current information for project DEA: 051N7004.
Project Information
Project Identifiers | Project ID: 993603 DEA: 051N7004 EFIS: 0521000081 |
---|---|
DIST-CO-RTE-PM | 05-SLO-166-16.0/21.0 |
Award Date | 04/22/2022 |
Closeout Date | 03/28/2023 |
Work Description | PARTIAL DEPTH RECYCLING AND OVERLAY WITH RHMA (GAP GRADED). |
Location Description | SAN LUIS OBISPO COUNTY ABOUT 8 MILES EAST OF SANTA MARIA FROM 0.5 MILE WEST OF HUASNA RIVER BRIDGE TO 1.9 MILES WEST OF CUYAMA RIVER BRIDGE. |
QA Service Level | 1 (Verified on 03/28/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
thomas.petersen@dot.ca.gov | Thomas Petersen | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 56 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-08-25-23 | 08/25/2022 | 08/25/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-08-25-24 | 08/25/2022 | 08/25/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-08-29-43 | 08/29/2022 | 08/29/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-08-29-44 | 08/29/2022 | 08/29/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-08-30-55 | 08/30/2022 | 08/30/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-08-30-56 | 08/30/2022 | 08/30/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-08-30-57 | 08/30/2022 | 08/30/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-08-30-70 | 08/30/2022 | 09/06/2022 | Department Acceptance | Asphalt Binder | View |
2022-08-30-73 | 08/30/2022 | 09/06/2022 | Department Acceptance | Asphalt Rubber Binder | View |
2022-08-31-20 | 08/31/2022 | 08/31/2022 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods