Project Details
This page displays current information for project DEA: 042K2404.
Project Information
| Project Identifiers | Project ID: 993602 DEA: 042K2404 EFIS: 0416000394 |
|---|---|
| DIST-CO-RTE-PM | 04-SON,SON-101-16.5-19 |
| Award Date | 05/09/2022 |
| Closeout Date | 07/24/2023 |
| Work Description | REMOVE EXISTING AND CONSTRUCT NEW CONCRETE BRIDGE RAILING. |
| Location Description | MARIN AND SONOMA COUNTIES AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 03/07/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| leonard.brajnikoff@dot.ca.gov | leonard brajnikoff | Resident Engineer | Caltrans RE DB |
| bunma.nou@dot.ca.gov | Bunma Nu | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-4 of 4 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-09-09-56 | 09/09/2022 | 09/23/2022 | Quality Assurance | Concrete | View |
| 2023-02-13-32 | 02/13/2023 | 02/16/2023 | Quality Assurance | Concrete | View |
| 2023-02-14-19 | 02/14/2023 | 02/14/2023 | Quality Assurance | Concrete | View |
| 2023-03-07-6 | 03/07/2023 | 03/13/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
