Project Details
This page displays current information for project DEA: 07301704.
Project Information
Project Identifiers | Project ID: 993526 DEA: 07301704 EFIS: 0714000033 |
---|---|
DIST-CO-RTE-PM | 07-LA-210,605-R33.6/R36.5,25.7/26.0 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | SLOPE PAVING, PLANT ESTABLISHMENT AND MODIFYING IRRIGATION SYSTEM. |
Location Description | LOS ANGELES COUNTY IN MONROVIA, DUARTE AND IRWINDALE AT VARIOUS LOCATIONS ON ROUTE 210 FROM 0.1 MILE WEST OF SOUTH MAGNOLIA AVENUE UNDERCROSSING TO 0.1 MILE EAST OF ROUTE 210/605 SEPARATION AND ON ROUTE 605 FROM 0.1 MILE SOUTH TO 0.2 MILE NORTH OF ROUTE 2 |
QA Service Level | 1 (Verified on 04/19/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
miguel.v.rodriguez@dot.ca.gov | Miguel Rodriguez | Resident Engineer | Caltrans RE DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-7 of 7 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-01-19-9 | 01/19/2024 | 01/19/2024 | Department Acceptance | Soil | View |
2024-01-19-10 | 01/19/2024 | 01/19/2024 | Department Acceptance | Soil | View |
2024-01-19-11 | 01/19/2024 | 01/19/2024 | Department Acceptance | Soil | View |
2024-01-19-14 | 01/19/2024 | 01/19/2024 | Department Acceptance | Aggregate | View |
2024-01-19-15 | 01/19/2024 | 01/19/2024 | Department Acceptance | Aggregate | View |
2024-01-19-16 | 01/19/2024 | 01/19/2024 | Department Acceptance | Aggregate | View |
2023-09-14-45 | 09/14/2023 | 09/19/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods