Project Details
This page displays current information for project DEA: 07325904.
Project Information
Project Identifiers | Project ID: 993484 DEA: 07325904 EFIS: 0716000091 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-87.4 |
Award Date | 02/17/2022 |
Closeout Date | Not set |
Work Description | SEISMIC RETROFIT OF BRIDGE, WIDEN |
Location Description | IN LOS ANGELES COUNTY, NEAR KERN COUNTY LINE, AT THE TEJON PASS OVERCROSSING BRIDGE NO 53-1779 |
QA Service Level | 1 (Verified on 04/19/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
oscar.osorio@dot.ca.gov | Oscar Osorio | Resident Engineer | Caltrans RE DB |
Adriana.Pimienta@dot.ca.gov | Adriana Pimienta | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-9 of 9 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-02-15-18 | 02/15/2023 | 02/15/2023 | Department Acceptance | Soil | View |
2023-02-07-7 | 02/07/2023 | 02/07/2023 | Quality Assurance | Aggregate | View |
2023-02-07-6 | 02/07/2023 | 02/07/2023 | Quality Assurance | Aggregate | View |
2023-02-07-5 | 02/07/2023 | 02/07/2023 | Quality Assurance | Aggregate | View |
2022-10-14-55 | 10/14/2022 | 10/24/2022 | Quality Assurance | Concrete | View |
2022-10-14-53 | 10/14/2022 | 10/24/2022 | Department Acceptance | Concrete | View |
2022-10-10-26 | 10/10/2022 | 10/10/2022 | Department Acceptance | Soil | View |
2022-10-06-38 | 10/06/2022 | 10/06/2022 | Quality Assurance | Aggregate | View |
2022-10-06-37 | 10/06/2022 | 10/06/2022 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods