Project Details
This page displays current information for project DEA: 051N3004.
Project Information
Project Identifiers | Project ID: 993481 DEA: 051N3004 EFIS: 0520000162 |
---|---|
DIST-CO-RTE-PM | 05-SB-1,154,166-Var |
Award Date | 02/08/2022 |
Closeout Date | 01/18/2023 |
Work Description | TREAT BRIDGE DECKS WITH METHACRYLATE & POLYESTER CONCRETE OVERLAYS. |
Location Description | SANTA BARBARA AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 01/03/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
sal.heredia@dot.ca.gov | Salvador Heredia | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-05-25-35 | 05/25/2022 | 05/26/2022 | Quality Control | Polyester | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods