Project Details
This page displays current information for project DEA: 032G3904.
Project Information
Project Identifiers | Project ID: 993480 DEA: 032G3904 EFIS: 0321000120 |
---|---|
DIST-CO-RTE-PM | 03-SAC-51-4.7/5.2,5.9/8.8 |
Award Date | 03/01/2022 |
Closeout Date | 05/15/2023 |
Work Description | COLD PLANE AC PAVEMENT, PLACE HMA AND REPLACE CONCRETE SLABS. |
Location Description | SACRAMENTO COUNTY IN AND NEAR SACRAMENTO FROM EL CAMINO AVENUE OVERCROSSING TO 0.4 MILE SOUTH OF MARCONI AVENUE OVERCROSSING AND FROM 0.4 MILE NORTH OF MARCONI AVENUE OVERCROSSING TO ROUTE 80, 51/244 SEPARATION |
QA Service Level | 1 (Verified on 12/28/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
Displaying 1-10 of 15 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-05-25-68 | 05/25/2022 | 06/06/2022 | Department Acceptance | Asphaltic Emulsion | View |
2022-06-14-10 | 06/14/2022 | 06/14/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-06-15-29 | 06/15/2022 | 06/15/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-06-20-7 | 06/20/2022 | 06/20/2022 | Quality Assurance | Asphalt Binder | View |
2022-06-20-8 | 06/20/2022 | 06/20/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-06-20-14 | 06/20/2022 | 06/21/2022 | Department Acceptance | Asphaltic Emulsion | View |
2022-06-20-25 | 06/20/2022 | 06/20/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-06-20-26 | 06/20/2022 | 06/20/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-06-21-6 | 06/21/2022 | 06/21/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-06-24-26 | 06/24/2022 | 06/24/2022 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods