Project Details

This page displays current information for project EFIS: 0000001157.

Project Information

Project IdentifiersProject ID: 993449
EFIS: 0000001157
Permit Numbers: 0421NMC0745 0421NRT3817
DIST-CO-RTE-PM04-SCL--22.665
Award Date06/01/2021
Closeout DateNot set
Work DescriptionAs part of a larger complete streets and green infrastructure project, the work within the STATE Highway right-of-way will:Perform clearing and grubbing. Remove concrete. Grind 2" AC repave with 2" RHMA. Rebuild PCC sidewalks and curb ramps on 3 of 4 comers. Shorten the curb radius on 2 co
Location DescriptionECR, Palo Alto
QA Service Level1 (Verified on 12/17/2021)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
Fernando.abela@dot.ca.govFernando AbelaResident EngineerCaltrans RE DB
dylan.larose@dot.ca.govDylan LaroseMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods