Project Details
This page displays current information for project DEA: 060H1404.
Project Information
Project Identifiers | Project ID: 993440 DEA: 060H1404 EFIS: 0616000194 |
---|---|
DIST-CO-RTE-PM | 06-TUL-190-34.7/39.4 |
Award Date | 02/11/2022 |
Closeout Date | 05/10/2023 |
Work Description | REMOVE AND REPLACE DRAINAGE SYSTEMS. |
Location Description | TULARE COUNTY NEAR SPRINGVILLE AT VARIOUS LOCATIONS FROM 2.4 MILES EAST OF BALCH PARK ROAD TO 0.6 MILE WEST OF WISHON ROAD |
QA Service Level | 1 (Verified on 12/09/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
javier.huerta@dot.ca.gov | Javier Huerta | Resident Engineer | Caltrans RE DB |
ulysis.baal@dot.ca.gov | Ulysis O. Baal | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 12 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-08-29-42 | 08/29/2022 | 09/01/2022 | Department Acceptance | Asphalt Binder | View |
2022-07-08-98 | 07/08/2022 | 07/15/2022 | Quality Control | Concrete | View |
2022-07-11-70 | 07/11/2022 | 07/18/2022 | Quality Control | Concrete | View |
2022-07-12-65 | 07/12/2022 | 07/19/2022 | Quality Control | Concrete | View |
2022-07-13-72 | 07/13/2022 | 07/20/2022 | Quality Control | Concrete | View |
2022-07-14-86 | 07/14/2022 | 07/21/2022 | Quality Control | Concrete | View |
2022-07-15-59 | 07/15/2022 | 07/22/2022 | Quality Control | Concrete | View |
2022-07-18-53 | 07/18/2022 | 07/25/2022 | Quality Control | Concrete | View |
2022-07-19-74 | 07/19/2022 | 08/26/2022 | Quality Control | Concrete | View |
2022-07-19-75 | 07/19/2022 | 07/20/2022 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods