Project Details
This page displays current information for project DEA: 07324404.
Project Information
Project Identifiers | Project ID: 993418 DEA: 07324404 EFIS: 0716000077 |
---|---|
DIST-CO-RTE-PM | 07-LA-22-0.0/1.5 |
Award Date | 02/18/2022 |
Closeout Date | 09/24/2024 |
Work Description | PLACE RHMA-G AND MODIFY SIGNAL AND LIGHTING SYSTEM. |
Location Description | LOS ANGELES COUNTY IN LONG BEACH FROM ROUTE 1 TO SAN GABRIEL RIVER UNDERCROSSING |
QA Service Level | 1 (Verified on 12/06/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Thang.Ton@dot.ca.gov | Thang Ton | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 67 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-09-14-72 | 09/14/2022 | 09/22/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-09-14-73 | 09/14/2022 | 09/22/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-09-14-86 | 09/14/2022 | 09/16/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-09-14-87 | 09/14/2022 | 09/15/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-09-15-61 | 09/15/2022 | 09/22/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-09-15-82 | 09/15/2022 | 09/26/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-09-15-83 | 09/15/2022 | 09/21/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-09-16-34 | 09/16/2022 | 09/22/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-09-16-35 | 09/16/2022 | 09/23/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-09-16-48 | 09/16/2022 | 09/20/2022 | Department Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods