Project Details
This page displays current information for project DEA: 07324404.
Project Information
| Project Identifiers | Project ID: 993418 DEA: 07324404 EFIS: 0716000077 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-22-0.0/1.5 |
| Award Date | 02/18/2022 |
| Closeout Date | 09/24/2024 |
| Work Description | PLACE RHMA-G AND MODIFY SIGNAL AND LIGHTING SYSTEM. |
| Location Description | LOS ANGELES COUNTY IN LONG BEACH FROM ROUTE 1 TO SAN GABRIEL RIVER UNDERCROSSING |
| QA Service Level | 1 (Verified on 12/06/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| Thang.Ton@dot.ca.gov | Thang Ton | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 67 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-09-06-42 | 09/06/2022 | 09/14/2022 | Department Acceptance | Hot Mix Asphalt | View |
| 2022-09-06-45 | 09/06/2022 | 09/19/2022 | Per Request | Asphalt Rubber Binder | View |
| 2022-09-06-74 | 09/06/2022 | 09/19/2022 | Verification | Crumb Rubber Modifier | View |
| 2022-09-06-75 | 09/06/2022 | 09/19/2022 | Verification | Crumb Rubber Modifier | View |
| 2022-09-07-50 | 09/07/2022 | 09/13/2022 | Verification | Aggregate | View |
| 2022-09-07-51 | 09/07/2022 | 09/13/2022 | Per Request | Asphalt Binder | View |
| 2022-09-07-59 | 09/07/2022 | 09/13/2022 | Per Request | Asphalt Rubber Binder | View |
| 2022-09-07-68 | 09/07/2022 | 09/13/2022 | Verification | Crumb Rubber Modifier | View |
| 2022-09-07-69 | 09/07/2022 | 09/13/2022 | Verification | Crumb Rubber Modifier | View |
| 2022-09-07-70 | 09/07/2022 | 09/14/2022 | Department Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
