Project Details
This page displays current information for project DEA: 101F4604.
Project Information
Project Identifiers | Project ID: 993400 DEA: 101F4604 EFIS: 1016000139 |
---|---|
DIST-CO-RTE-PM | 10-SJ-4-4.5/4.9 |
Award Date | 01/25/2022 |
Closeout Date | 05/08/2024 |
Work Description | RIVER BRIDGE AND ROADWAY REALIGNMENT. |
Location Description | SAN JOAQUIN COUNTY NEAR HOLT FROM MIDDLE RIVER BRIDGE TO 0.5 MILE EAST OF MIDDLE RIVER BRIDGE. |
QA Service Level | 1 (Verified on 11/09/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
tofael.anwar@dot.ca.gov | Tofael Anwar | Resident Engineer | Caltrans RE DB |
daniel.laureno@dot.ca.gov | Daniel Laureno | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-07-21-46 | 07/21/2022 | 07/29/2022 | Department Acceptance | Asphalt Binder | View |
2023-09-10-7 | 09/10/2023 | 10/09/2023 | Department Acceptance | Asphalt Binder | View |
2023-09-10-8 | 09/10/2023 | 10/10/2023 | Department Acceptance | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods