Project Details
This page displays current information for project DEA: 07323404.
Project Information
Project Identifiers | Project ID: 993387 DEA: 07323404 EFIS: 0716000064 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-R59.5/R67.9 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | PLACE CULVERT, REPLACE DRAINAGE SYSTEM, RECONST ROADWAY & EMBANKMENT. |
Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM LAKE HUGHES ROAD UNDERCROSSING TO 1.9 MILES NORTH OF TEMPLIN HIGHWAY UNDERCROSSING |
QA Service Level | 1 (Verified on 12/06/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
oscar.osorio@dot.ca.gov | Oscar Osorio | Resident Engineer | Caltrans RE DB |
chanh.tong@dot.ca.gov | Chanh Tong | Structural Representative | Caltrans SR DB |
jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 307 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-01-15-38 | 01/15/2025 | 01/15/2025 | Quality Assurance | Aggregate | View |
2024-11-14-53 | 11/14/2024 | 11/14/2024 | Quality Assurance | Concrete | View |
2024-09-25-121 | 09/25/2024 | 09/28/2024 | Acceptance | Hot Mix Asphalt | View |
2024-09-25-120 | 09/25/2024 | 09/28/2024 | Acceptance | Hot Mix Asphalt | View |
2024-09-26-120 | 09/26/2024 | 09/28/2024 | Acceptance | Hot Mix Asphalt | View |
2024-10-24-86 | 10/24/2024 | 12/05/2024 | Acceptance | Hot Mix Asphalt | View |
2024-12-10-1 | 12/10/2024 | 12/10/2024 | Acceptance | Hot Mix Asphalt | View |
2024-09-25-118 | 09/25/2024 | 12/05/2024 | Acceptance | Hot Mix Asphalt | View |
2024-09-25-117 | 09/25/2024 | 12/10/2024 | Acceptance | Hot Mix Asphalt | View |
2024-09-24-127 | 09/24/2024 | 12/05/2024 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods