Project Details
This page displays current information for project DEA: 060U2804.
Project Information
Project Identifiers | Project ID: 993301 DEA: 060U2804 EFIS: 0615000293 |
---|---|
DIST-CO-RTE-PM | 06-TUL-245-1.4,4.2 |
Award Date | 01/03/2022 |
Closeout Date | Not set |
Work Description | PRECAST PRESTRESSED CONCRETE BOX GIRDER AND SLAB, BRIDGE REMOVAL. |
Location Description | TULARE COUNTY NEAR WOODLAKE AT YOKOHL CREEK BRIDGE AND AT KAWEAH RIVER BRIDGE |
QA Service Level | 1 (Verified on 10/11/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mike.r.garrett@dot.ca.gov | Mike Garrett | Resident Engineer | Caltrans RE DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 55 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-07-12-3 | 07/12/2022 | 07/13/2022 | Department Acceptance | SMTL TM5 - Welded Hoops | View |
2022-07-12-4 | 07/12/2022 | 07/13/2022 | Department Acceptance | SMTL TM5 - Welded Hoops | View |
2022-07-25-7 | 07/25/2022 | 07/27/2022 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2022-07-25-8 | 07/25/2022 | 07/27/2022 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2022-07-25-9 | 07/25/2022 | 07/27/2022 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2022-07-26-7 | 07/26/2022 | 07/27/2022 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2022-07-26-8 | 07/26/2022 | 07/27/2022 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2022-08-05-5 | 08/05/2022 | 08/05/2022 | Quality Assurance | SMTL TM5 - Headed Bars | View |
2022-08-10-28 | 08/10/2022 | 08/12/2022 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2022-08-11-3 | 08/11/2022 | 08/29/2022 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods