Project Details

This page displays current information for project DEA: 010E0904.

Project Information

Project IdentifiersProject ID: 993279
DEA: 010E0904
EFIS: 0113000123
DIST-CO-RTE-PM01-MEN-20-33.3/34.4
Award Date05/06/2022
Closeout DateNot set
Work DescriptionCONSTRUCT NEW BRIDGE, REMOVE TWO BRIDGES, EARTHWORK AND PAVING. (Bridge No. 10-0310)
Location DescriptionMENDOCINO COUNTY NEAR UKIAH FROM 0.3 MILE WEST OF RUSSIAN RIVER BRIDGE AND OVERHEAD TO 0.3 MILE EAST OF COUNTY ROAD 144
QA Service Level1 (Verified on 10/04/2021)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
geoffrey.wright@dot.ca.govGeoffrey WrightResident EngineerCaltrans RE DB
Kari.Forbes@dot.ca.govKari ForbesStructural RepresentativeCaltrans SR DB
peter.gan@dot.ca.govPeter GanMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 49 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2022-08-16-608/16/202208/22/2022Quality AssuranceSMTL TM5 - Welded HoopsView
2022-08-24-708/24/202208/26/2022Quality AssuranceSMTL TM5 - Welded HoopsView
2022-09-16-2809/16/202209/19/2022Quality AssuranceSMTL TM5 - Headed BarsView
2023-02-13-1202/13/202302/15/2023Quality AssuranceSMTL TM5 - Headed BarsView
2023-02-13-1302/13/202302/15/2023Quality AssuranceSMTL TM5 - Headed BarsView
2023-02-13-1402/13/202302/15/2023Quality AssuranceSMTL TM5 - Headed BarsView
2023-02-13-1502/13/202302/15/2023Quality AssuranceSMTL TM5 - Headed BarsView
2023-02-13-1702/13/202302/13/2023Quality AssuranceSMTL TM5 - Headed BarsView
2023-02-13-2902/13/202302/15/2023Quality AssuranceSMTL TM5 - Headed BarsView
2023-02-13-3002/13/202302/13/2023Quality AssuranceSMTL TM5 - Headed BarsView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods