Project Details

This page displays current information for project DEA: 031H18U4.

Project Information

Project IdentifiersProject ID: 993193
DEA: 031H18U4
EFIS: 0321000106
DIST-CO-RTE-PM03-NEV-80-13.0/16.5
Award Date11/04/2021
Closeout Date12/14/2023
Work DescriptionROADWAY EXCAVATION, JPCP AND FURNISH POLYESTER CONCRETE OVERLAY.
Location DescriptionNEVADA COUNTY IN AND NEAR TRUCKEE FROM 0.2 MILE WEST OF DONNER PARK OVERCROSSING TO ROUTE 89/267 SEPARATION
QA Service Level1 (Verified on 08/23/2021)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
randy.stellhorn@dot.ca.govRandy StellhornResident EngineerCaltrans RE DB
carl.c.anderson@dot.ca.govCarl AndersonStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 1-10 of 43 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2022-07-22-3307/22/2022Quality AssuranceSMTL TM7 - Epoxy Coated DowelsView
2022-07-22-3907/22/2022Quality AssuranceSMTL TM7 - Epoxy Coated DowelsView
2022-07-22-4307/22/202207/25/2022Quality AssuranceSMTL TM7 - Epoxy Coated DowelsView
2022-07-22-4607/22/202207/25/2022Quality AssuranceSMTL TM7 - Epoxy Coated DowelsView
2022-06-22-506/22/202206/21/2022Quality ControlPolyesterView
2022-08-03-208/03/202208/03/2022Quality ControlPolyesterView
2022-08-04-3508/04/202208/05/2022Quality ControlPolyesterView
2022-08-19-2008/19/202208/22/2022Quality ControlPolyesterView
2022-08-23-2508/23/202208/23/2022Quality ControlHot Mix AsphaltView
2022-08-23-2608/23/202208/23/2022Quality ControlHot Mix AsphaltView

Job Mix Formula (JMF)

JMFs associated with this project.

Displaying 1-2 of 2 results.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
JMF3511-23-2023-49Submittal Authorized For Use CT D03 - Olivehurst Northern Regional Laboratory10/24/2023View
JMF3511-23-2023-48Submittal Authorized For Use CT D03 - Olivehurst Northern Regional Laboratory10/23/2023View

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods