Project Details
This page displays current information for project DEA: 031H18U4.
Project Information
| Project Identifiers | Project ID: 993193 DEA: 031H18U4 EFIS: 0321000106 |
|---|---|
| DIST-CO-RTE-PM | 03-NEV-80-13.0/16.5 |
| Award Date | 11/04/2021 |
| Closeout Date | 12/14/2023 |
| Work Description | ROADWAY EXCAVATION, JPCP AND FURNISH POLYESTER CONCRETE OVERLAY. |
| Location Description | NEVADA COUNTY IN AND NEAR TRUCKEE FROM 0.2 MILE WEST OF DONNER PARK OVERCROSSING TO ROUTE 89/267 SEPARATION |
| QA Service Level | 1 (Verified on 08/23/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| randy.stellhorn@dot.ca.gov | Randy Stellhorn | Resident Engineer | Caltrans RE DB |
| carl.c.anderson@dot.ca.gov | Carl Anderson | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 43 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2022-08-31-11 | 08/31/2022 | 08/31/2022 | Quality Control | Hot Mix Asphalt | View |
| 2022-09-24-7 | 09/24/2022 | 09/26/2022 | Quality Control | Hot Mix Asphalt | View |
| 2022-09-24-19 | 09/24/2022 | 09/24/2022 | Quality Control | Hot Mix Asphalt | View |
| 2022-10-04-45 | 10/04/2022 | 10/04/2022 | Quality Control | Hot Mix Asphalt | View |
| 2022-10-05-49 | 10/05/2022 | 10/13/2022 | Quality Control | Hot Mix Asphalt | View |
| 2022-06-22-5 | 06/22/2022 | 06/21/2022 | Quality Control | Polyester | View |
| 2022-08-03-2 | 08/03/2022 | 08/03/2022 | Quality Control | Polyester | View |
| 2022-08-04-35 | 08/04/2022 | 08/05/2022 | Quality Control | Polyester | View |
| 2022-08-19-20 | 08/19/2022 | 08/22/2022 | Quality Control | Polyester | View |
| 2022-07-22-33 | 07/22/2022 | Quality Assurance | SMTL TM7 - Epoxy Coated Dowels | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
