Project Details
This page displays current information for project DEA: 040A7724.
Project Information
Project Identifiers | Project ID: 993184 DEA: 040A7724 EFIS: 0420000288 COOP: 042763 |
---|---|
DIST-CO-RTE-PM | 04-ALA-80-6.4/6.8 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Excavation, HMA, structural concrete, minor concrete and drainage. |
Location Description | IN BERKELEY AND ALBANY FROM 0.6 MILE NORTH OF UNIVERSITY AVENUE OVERCROSSING TO 0.3 MILE SOUTH OF EL CERRITO SEPARATION AND OVERHEAD |
QA Service Level | 1 (Verified on 04/08/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
maxime.dabilly@dot.ca.gov | Maxime Dabilly | Resident Engineer | Caltrans RE DB |
eric.urmeneta@dot.ca.gov | Eric Urementa | Structural Representative | Caltrans SR DB |
dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 91-100 of 109 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-04-04-8 | 04/04/2023 | 04/04/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-04-04-9 | 04/04/2023 | 04/04/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-06-108 | 06/06/2023 | 06/06/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-17-31 | 06/17/2023 | 06/17/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-30-59 | 06/30/2023 | 07/04/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-30-60 | 06/30/2023 | 07/04/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-01-131 | 06/01/2023 | 06/20/2023 | Quality Assurance | Hot Mix Asphalt | View |
2022-09-12-49 | 09/12/2022 | 09/15/2022 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2022-03-02-1 | 03/02/2022 | 03/24/2022 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2022-03-02-2 | 03/02/2022 | 03/02/2022 | Quality Control | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods