Project Details

This page displays current information for project DEA: 031H2704.

Project Information

Project IdentifiersProject ID: 993183
DEA: 031H2704
EFIS: 0316000082
DIST-CO-RTE-PM03-YUB-70-R11.2/13.5
Award Date10/14/2021
Closeout DateNot set
Work DescriptionUPGRADE BRIDGE RAILS & CONSTRUCT CONCRETE MEDIAN BARRIER.
Location DescriptionYUBA COUNTY NEAR LINDA AND MARYSVILLE FROM 2.4 MILES SOUTH OF FEATHER RIVER BOULEVARD UNDERCROSSING TO THE YUBA RIVER BRIDGE AND OVERHEAD
QA Service Level1 (Verified on 08/16/2021)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
Selvendran.Manoharan@dot.ca.govSelvendran ManoharanResident EngineerCaltrans RE DB
brent.bullard@dot.ca.govBrent BullardStructural RepresentativeCaltrans SR DB
justin.palmaymesa@dot.ca.govJustin PalmaymesaMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 71-80 of 90 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2022-07-15-4207/15/202207/15/2022Quality ControlAggregateView
2022-07-15-1907/15/202207/18/2022Quality AssuranceConcreteView
2022-07-15-1807/15/202207/18/2022Quality AssuranceConcreteView
2022-07-15-1707/15/202207/18/2022Quality AssuranceConcreteView
2022-07-12-3207/12/202207/12/2022Quality ControlConcreteView
2022-07-12-3107/12/202207/12/2022Quality ControlAggregateView
2022-07-12-3007/12/202207/12/2022Quality ControlAggregateView
2022-07-12-2907/12/202207/13/2022Quality AssuranceConcreteView
2022-07-01-2507/01/202207/01/2022Quality ControlConcreteView
2022-07-01-2407/01/202207/01/2022Quality ControlAggregateView

Job Mix Formula (JMF)

JMFs associated with this project.

Displaying 1-1 of 1 result.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
JMF3511-23-2022-4Submittal Authorized For Use CT D03 - Olivehurst Northern Regional Laboratory03/22/2022View

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods