Project Details
This page displays current information for project DIME:993179.
Project Information
Project Identifiers | Project ID: 993179 Permit Numbers: 0421NOP1472 |
---|---|
DIST-CO-RTE-PM | 04-SCL--48.6 |
Award Date | 03/01/2021 |
Closeout Date | 09/13/2022 |
Work Description | The project will construct improvements along Shoreline Boulevard (Blvd) within the limits of the US 101 Interchange. The project improvements include conversion of the existing median to a reversible bus lane, elimination of access from northbound Shoreline Blvd to State Route 85 (SR85), construct |
Location Description | Shoreline Blvd. , Mountain View |
QA Service Level | 1 (Verified on 09/02/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
nabi.bagheri@dot.ca.gov | Nabi Bagheri | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods