Project Details
This page displays current information for project DEA: 050A0904.
Project Information
Project Identifiers | Project ID: 993169 DEA: 050A0904 EFIS: 0513000028 |
---|---|
DIST-CO-RTE-PM | 05-MON-156-R1.4/R2.0 |
Award Date | 12/14/2021 |
Closeout Date | Not set |
Work Description | WIDEN REINFORCED STRUCTURAL CONCRETE BRIDGE & REPLACE BRIDGE RAILING. |
Location Description | MONTEREY COUNTY IN AND NEAR CASTROVILLE FROM 0.3 MILE EAST OF ROUTE 156/183 SEPARATION TO 0.2 MILE EAST OF CASTROVILLE BOULEVARD |
QA Service Level | 1 (Verified on 08/17/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
david.hopper@dot.ca.gov | David Hopper | Resident Engineer | Caltrans RE DB |
dean.russu@dot.ca.gov | Dean Russu | Structural Representative | Caltrans SR DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 41 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-05-06-8 | 05/06/2022 | 05/12/2022 | Annual Source Testing | Hot Mix Asphalt | View |
2023-02-14-38 | 02/14/2023 | 02/15/2023 | Quality Assurance | Concrete | View |
2023-02-16-36 | 02/16/2023 | 02/17/2023 | Quality Assurance | Concrete | View |
2023-04-14-17 | 04/14/2023 | 04/15/2023 | Quality Assurance | Concrete | View |
2023-06-26-80 | 06/26/2023 | 06/27/2023 | Quality Assurance | Concrete | View |
2022-08-19-79 | 08/19/2022 | 08/19/2022 | Quality Control | Concrete | View |
2023-08-02-74 | 08/02/2023 | 08/03/2023 | Quality Assurance | Concrete | View |
2022-05-03-23 | 05/03/2022 | 05/09/2022 | Department Acceptance | Asphaltic Emulsion | View |
2023-10-18-7 | 10/18/2023 | 10/24/2023 | Quality Assurance | Asphaltic Emulsion | View |
2023-10-19-11 | 10/19/2023 | 10/24/2023 | Quality Assurance | Asphaltic Emulsion | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods