Project Details

This page displays current information for project DIME:993163.

Project Information

Project IdentifiersProject ID: 993163
Permit Numbers: 0321AOP0723
DIST-CO-RTE-PM03-NEV-80-13.1 VAR
Award Date06/01/2021
Closeout DateNot set
Work DescriptionConstruct a single lane roundabout at the current stop controlled intersection of the eastbound I-80 ramps at Donner Pass Road interchange (PM 13.1)as per the attached plans and documents submitted to the Caltrans Encroachment Office.
Location DescriptionIntersection of the eastbound I-80 ramps at Donner Pass Road interchange (PM 13.1)
QA Service Level1 (Verified on 07/29/2021)

Samples

Samples submitted for this project.

Job Mix Formula (JMF)

JMFs associated with this project.
JMF IDStatusSubmitted byDIME Sample IDDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs submitted for this project.
Declaration NumberProgram OperatorMaterial TypeVendorSubmitted by
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods