Project Details
This page displays current information for project DEA: 08323034.
Project Information
Project Identifiers | Project ID: 993159 DEA: 08323034 EFIS: 0812000059 COOP: 081703 |
---|---|
DIST-CO-RTE-PM | 08-RIV-60-18.8/19.6 |
Award Date | 05/04/2021 |
Closeout Date | Not set |
Work Description | Project Phase 2 (project) proposes to replace the existing hook ramp configuration along westbound (WB) SR-60 at the SR- 60/Moreno Beach Drive interchange with a partial cloverleaf configuration |
Location Description | SR-60 & Moreno Beach Interchange |
QA Service Level | 2 (Verified on 07/27/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
rasanayagam.nitharsan@dot.ca.gov | Nitha Nitharsan | Resident Engineer | Caltrans RE DB |
jrojas@falcon-ca.com | Juan Rojas | Oversight Resident Engineer | Caltrans REO DB |
greg.Alexander@dot.ca.gov | Greg Alexander | Structural Representative | Caltrans SR DB |
aalina@falcon-ca.com | Al Alina | Oversight Structural Representative | Caltrans SRO DB |
jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-4 of 4 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-05-31-63 | 05/31/2023 | 06/16/2023 | Verification | Aggregate | View |
2023-05-31-64 | 05/31/2023 | 06/16/2023 | Verification | Crumb Rubber Modifier | View |
2023-05-31-65 | 05/31/2023 | 06/16/2023 | Verification | Crumb Rubber Modifier | View |
2023-05-31-72 | 05/31/2023 | 06/16/2023 | Verification | Asphalt Rubber Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods