Project Details
This page displays current information for project DEA: 120R3404.
Project Information
Project Identifiers | Project ID: 993154 DEA: 120R3404 EFIS: 1218000079 |
---|---|
DIST-CO-RTE-PM | 12-ORA-73-12.9/R26.8 |
Award Date | 09/16/2021 |
Closeout Date | 09/28/2023 |
Work Description | REPLACE APPROACH SLABS, JOINT SEAL, AND APPLY METHACRYLATE ON BRIDGES. |
Location Description | ORANGE COUNTY AT VARIOUS LOCATIONS FROM MOULTON PARKWAY UNDERCROSSING IN LAGUNA NIGUEL TO BRISTOL STREET UNDERCROSSING IN COSTA MESA |
QA Service Level | 1 (Verified on 08/02/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
nabil.ruda@dot.ca.gov | Nabil J. Ruda | Resident Engineer | Caltrans RE DB |
ali.jenabzadeh@dot.ca.gov | Ali Jenabzadeh | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-9 of 9 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-02-01-25 | 02/01/2022 | 02/01/2022 | Quality Control | Methacrylate | View |
2022-03-10-5 | 03/10/2022 | 03/09/2022 | Per Request | Rapid Set | View |
2022-03-10-43 | 03/10/2022 | 03/17/2022 | Quality Assurance | Rapid Set | View |
2022-10-08-14 | 10/08/2022 | 10/10/2022 | Quality Assurance | Concrete | View |
2022-10-08-15 | 10/08/2022 | 10/10/2022 | Quality Assurance | Concrete | View |
2022-11-05-6 | 11/05/2022 | 11/05/2022 | Quality Assurance | Concrete | View |
2023-04-29-4 | 04/29/2023 | 04/29/2023 | Quality Assurance | Concrete | View |
2023-04-29-5 | 04/29/2023 | 04/29/2023 | Quality Assurance | Concrete | View |
2023-05-06-1 | 05/06/2023 | 05/06/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods