Project Details
This page displays current information for project DEA: 120H0474.
Project Information
Project Identifiers | Project ID: 993153 DEA: 120H0474 EFIS: 1212000053 |
---|---|
DIST-CO-RTE-PM | 12-ORA-241-27.8/38.0 |
Award Date | 10/21/2021 |
Closeout Date | Not set |
Work Description | PLACE HMA AND PERFORATED PLASTIC PIPE UNDERDRAIN. |
Location Description | ORANGE COUNTY AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF ROUTE 133 TO 0.5 MILE SOUTH OF ROUTE 91 |
QA Service Level | 1 (Verified on 08/02/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mohamad.yacoub@dot.ca.gov | Mohamad Yacoub | Resident Engineer | Caltrans RE DB |
james.devey@dot.ca.gov | James Devey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 61-65 of 65 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-11-30-58 | 11/30/2023 | 12/08/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-12-03-7 | 12/03/2023 | 12/03/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-12-04-51 | 12/04/2023 | 12/04/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-12-05-57 | 12/05/2023 | 12/05/2023 | Quality Assurance | Hot Mix Asphalt | View |
2024-02-26-10 | 02/26/2024 | 02/28/2024 | Verification | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods