Project Details
This page displays current information for project DEA: 051G9704.
Project Information
Project Identifiers | Project ID: 993150 DEA: 051G9704 EFIS: 0516000008 |
---|---|
DIST-CO-RTE-PM | 05-SB-135-11.7/17.8 |
Award Date | 09/27/2021 |
Closeout Date | 03/28/2023 |
Work Description | COLD PLANE, OVERLAY ROADWAY WITH RHMA (GAP GRADED) AND ADA CURB RAMPS. |
Location Description | SANTA BARBARA COUNTY IN AND NEAR SANTA MARIA FROM LAKEVIEW ROAD TO NORTH SANTA MARIA CONNECTOR |
QA Service Level | 1 (Verified on 08/09/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Thomas.Petersen@dot.ca.gov | Thomas Petersen | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 46 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-04-29-38 | 04/29/2022 | 04/29/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-05-03-44 | 05/03/2022 | 05/04/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-05-03-45 | 05/03/2022 | 05/04/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-05-04-45 | 05/04/2022 | 05/05/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-05-04-46 | 05/04/2022 | 05/05/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-05-06-37 | 05/06/2022 | 05/06/2022 | Department Acceptance | Aggregate | View |
2022-05-06-38 | 05/06/2022 | 05/06/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-05-05-46 | 05/05/2022 | 05/09/2022 | Quality Assurance | Hot Mix Asphalt | View |
2022-05-09-42 | 05/09/2022 | 05/09/2022 | Department Acceptance | Aggregate | View |
2022-05-09-45 | 05/09/2022 | 05/09/2022 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods