Project Details
This page displays current information for project DIME:993142.
Project Information
Project Identifiers | Project ID: 993142 Permit Numbers: 08196CD0860 08216RT0988 |
---|---|
DIST-CO-RTE-PM | 08---4.7/-1 |
Award Date | 06/01/2019 |
Closeout Date | Not set |
Work Description | Enter onto State Route 79 (SR-79) right-of-way at Murrieta Hot Springs Road in the Cityof Murrieta to construct widened pavement, curb and gutter, sidewalk, curb ramp, installstreet light, restripe, modify signal, and install new landscaping/irrigation as per plansdate stamped, August 11, 2020 by t |
Location Description | Winchester Road, Murrieta |
QA Service Level | 1 (Verified on 09/08/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Ardo.Narvasa@dot.ca.gov | ARDO NARVASA | Resident Engineer | Caltrans RE DB |
Ardo.Narvasa@dot.ca.gov | Ardo Narvasa | Oversight Resident Engineer | Caltrans REO DB |
roger.khoudessian@dot.ca.gov | Roger Khoudessian | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods