Project Details
This page displays current information for project DEA: 060V1204.
Project Information
Project Identifiers | Project ID: 993141 DEA: 060V1204 EFIS: 0616000207 |
---|---|
DIST-CO-RTE-PM | 06-MAD-99-R6.9/R7.6 |
Award Date | 06/22/2022 |
Closeout Date | Not set |
Work Description | Cottonwood Creek Bridge Replacement - REPLACE BRIDGES AND CONSTRUCT RETAINING WALLS. |
Location Description | MADERA COUNTY NEAR MADERA FROM 0.4 MILE SOUTH OF COTTONWOOD CREEK BRIDGE TO 0.1 MILE NORTH OF AVENUE 12 OVERCROSSING |
QA Service Level | 1 (Verified on 07/28/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
din.dadawalla@dot.ca.gov | Din Dadawalla | Resident Engineer | Caltrans RE DB |
ye.yang@dot.ca.gov | Ye Yang | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 51-60 of 137 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-06-30-21 | 06/30/2023 | 07/01/2023 | Quality Assurance | Concrete | View |
2023-06-30-22 | 06/30/2023 | 07/01/2023 | Quality Assurance | Concrete | View |
2023-07-14-22 | 07/14/2023 | 07/15/2023 | Quality Assurance | Concrete | View |
2023-07-11-36 | 07/11/2023 | 07/12/2023 | Quality Assurance | Concrete | View |
2023-06-22-57 | 06/22/2023 | 06/23/2023 | Verification | Concrete | View |
2023-07-12-47 | 07/12/2023 | 07/13/2023 | Verification | Concrete | View |
2023-06-30-42 | 06/30/2023 | 07/01/2023 | Quality Assurance | Concrete | View |
2023-07-31-66 | 07/31/2023 | 08/01/2023 | Department Acceptance | Concrete | View |
2023-08-11-26 | 08/11/2023 | 07/17/2023 | Department Acceptance | Concrete | View |
2023-06-14-101 | 06/14/2023 | 06/15/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-4 of 4 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
SCS-EPD-06643 | Carbon Steel Rebar | EVRAZ North America | Kie-Con, Incorporated - Antioch (Connor Pelan) | 10691lbs 10691lbs |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | Kie-Con, Incorporated - Antioch (Connor Pelan) | 28909 28909 |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | Kie-Con, Incorporated - Antioch (Connor Pelan) | 35270 lbs. 35270 lbs. |
EPD-191 | Carbon Steel Rebar | CMC - Durant | Kie-Con, Incorporated - Antioch (Connor Pelan) | 9711 lbs 9711 lbs |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods