Project Details
This page displays current information for project DEA: 07322304.
Project Information
Project Identifiers | Project ID: 993122 DEA: 07322304 EFIS: 0716000054 |
---|---|
DIST-CO-RTE-PM | 07-LA-110-22.8 |
Award Date | 10/04/2021 |
Closeout Date | Not set |
Work Description | CONSTRUCT AND REPLACE BRIDGE RAILS. |
Location Description | LOS ANGELES COUNTY IN LOS ANGELES AT FIFTH STREET OVERCROSSING AND AT SIXTH STREET OVERCROSSING |
QA Service Level | 1 (Verified on 08/04/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
edgar.herrera@dot.ca.gov | Edgar Herrera | Resident Engineer | Caltrans RE DB |
peter.wang@bureauveritas.com | Peter Wang | Structural Representative | Caltrans SR DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 36 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-02-24-7 | 02/24/2022 | 02/24/2022 | Acceptance | Soil | View |
2022-02-24-8 | 02/24/2022 | 02/24/2022 | Acceptance | Soil | View |
2022-03-09-1 | 03/09/2022 | 03/09/2022 | Acceptance | Aggregate | View |
2022-04-11-37 | 04/11/2022 | 04/11/2022 | Acceptance | Aggregate | View |
2022-04-11-38 | 04/11/2022 | 04/13/2022 | Acceptance | Aggregate | View |
2022-04-11-39 | 04/11/2022 | 04/13/2022 | Acceptance | Aggregate | View |
2022-04-12-30 | 04/12/2022 | 04/14/2022 | Acceptance | Aggregate | View |
2022-04-13-65 | 04/13/2022 | 04/20/2022 | Acceptance | Aggregate | View |
2022-04-14-46 | 04/14/2022 | 04/20/2022 | Acceptance | Aggregate | View |
2022-04-14-49 | 04/14/2022 | 04/20/2022 | Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods