Project Details
This page displays current information for project DEA: PC-Barrier-STOCK.
Project Information
Project Identifiers | Project ID: 88887 DEA: PC-Barrier-STOCK EFIS: PC-Barrier-STOCK |
---|---|
DIST-CO-RTE-PM | 59--- |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Special project for precast barrier rail stock material. |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
Displaying 1-10 of 59 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-03-14-12 | 03/14/2025 | 03/17/2025 | Quality Control | Concrete | View |
2025-03-07-32 | 03/07/2025 | 03/10/2025 | Quality Control | Concrete | View |
2025-03-05-33 | 03/05/2025 | 03/06/2025 | Quality Control | Concrete | View |
2025-03-03-43 | 03/03/2025 | 03/04/2025 | Quality Control | Concrete | View |
2025-02-24-64 | 02/24/2025 | 02/25/2025 | Quality Control | Concrete | View |
2025-02-21-43 | 02/21/2025 | 02/24/2025 | Quality Control | Concrete | View |
2025-02-20-47 | 02/20/2025 | 02/21/2025 | Quality Control | Concrete | View |
2025-03-12-10 | 03/12/2025 | 03/13/2025 | Quality Control | Concrete | View |
2025-03-10-75 | 03/10/2025 | 03/11/2025 | Quality Control | Concrete | View |
2025-02-27-38 | 02/27/2025 | 02/28/2025 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods