Project Details
This page displays current information for project DEA: 040A1854.
Project Information
Project Identifiers | Project ID: 7826 DEA: 040A1854 EFIS: 0400020652 COOP: 042363 |
---|---|
DIST-CO-RTE-PM | 04-SON-101-7.1/8.1 |
Award Date | 02/12/2013 |
Closeout Date | 01/03/2017 |
Work Description | RECONSTRUCT INTERCHANGE |
Location Description | SONOMA COUNTY IN PETALUMA FROM 0.6 MILE SOUTH TO 0.4 MILE NORTH OF OLD REDWOOD HIGHWAY OVERCROSSING |
QA Service Level | 1 (Verified on 12/10/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
hal.j.streater@dot.ca.gov | Hal Streater | Resident Engineer | Caltrans RE DB |
jonathan.chi@dot.ca.gov | Jonathan Chi | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 11-19 of 19 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-01-28-3 | 01/28/2015 | 02/24/2015 | Quality Control | Concrete | View |
2015-01-28-4 | 01/28/2015 | 02/24/2015 | Quality Control | Concrete | View |
2015-08-07-7 | 08/07/2015 | 08/14/2015 | Quality Control | Concrete | View |
2013-11-13-7032 | 11/13/2013 | 11/14/2013 | Verification | Concrete | View |
2013-11-15-8305233 | 11/15/2013 | 11/18/2013 | Verification | Concrete | View |
2013-11-19-8307297 | 11/19/2013 | 11/20/2013 | Verification | Concrete | View |
2014-10-24-4 | 10/24/2014 | 10/24/2014 | Verification | Concrete | View |
2015-04-09-8 | 04/09/2015 | 04/15/2015 | Verification | Job Mix Formula Partial | View |
2015-04-27-15 | 04/27/2015 | 04/27/2015 | Verification | Job Mix Formula Partial | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods