Project Details
This page displays current information for project DEA: 112T1824.
Project Information
Project Identifiers | Project ID: 7780 DEA: 112T1824 EFIS: 1100020051 |
---|---|
DIST-CO-RTE-PM | 11-SD-805-4.7/5.6 |
Award Date | 01/03/2013 |
Closeout Date | 09/07/2018 |
Work Description | REPLACE STRUCTURE AND CONSTRUCT DIRECT ACCESS RAMP (DAR). |
Location Description | SAN DIEGO COUNTY IN CHULA VISTA FROM 0.4 MILE SOUTH OF EAST PALOMAR STREET OVERCROSSING TO 0.1 MILE NORTH OF NAPLES STREET UNDERCROSSING |
QA Service Level | 1 (Verified on 12/10/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
Displaying 1-10 of 989 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2013-03-26-14187147 | 03/26/2013 | Quality Control | Concrete | View | |
2013-08-19-14001984 | 08/19/2013 | 08/20/2013 | Quality Control | Concrete | View |
2013-08-20-6260492 | 08/20/2013 | 08/21/2013 | Quality Control | Concrete | View |
2013-08-20-9308691 | 08/20/2013 | 08/21/2013 | Quality Control | Concrete | View |
2013-08-20-10305932 | 08/20/2013 | 08/21/2013 | Quality Control | Concrete | View |
2013-08-20-13103783 | 08/20/2013 | 08/21/2013 | Quality Control | Concrete | View |
2013-08-21-11307101 | 08/21/2013 | 08/22/2013 | Quality Control | Concrete | View |
2013-08-22-9501832 | 08/22/2013 | 08/23/2013 | Quality Control | Concrete | View |
2013-08-29-13107475 | 08/29/2013 | 08/30/2013 | Quality Control | Concrete | View |
2013-07-16-1920 | 07/16/2013 | 09/04/2013 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods