Project Details
This page displays current information for project DEA: 112T1824.
Project Information
| Project Identifiers | Project ID: 7780 DEA: 112T1824 EFIS: 1100020051 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-805-4.7/5.6 |
| Award Date | 01/03/2013 |
| Closeout Date | 09/07/2018 |
| Work Description | REPLACE STRUCTURE AND CONSTRUCT DIRECT ACCESS RAMP (DAR). |
| Location Description | SAN DIEGO COUNTY IN CHULA VISTA FROM 0.4 MILE SOUTH OF EAST PALOMAR STREET OVERCROSSING TO 0.1 MILE NORTH OF NAPLES STREET UNDERCROSSING |
| QA Service Level | 1 (Verified on 12/10/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| No results found. | |||
Samples
Samples submitted for this project.
Displaying 21-30 of 989 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2013-09-11-17201056 | 09/11/2013 | Quality Control | Concrete | View | |
| 2013-09-13-13009717 | 09/13/2013 | Quality Control | Concrete | View | |
| 2013-09-16-8201715 | 09/16/2013 | 09/17/2013 | Quality Control | Concrete | View |
| 2013-09-18-8102993 | 09/18/2013 | Quality Control | Concrete | View | |
| 2013-09-18-9454250 | 09/18/2013 | Quality Control | Concrete | View | |
| 2013-09-18-11450316 | 09/18/2013 | Quality Control | Concrete | View | |
| 2013-09-18-13404632 | 09/18/2013 | Quality Control | Concrete | View | |
| 2013-09-18-9459147 | 09/18/2013 | Verification | Concrete | View | |
| 2013-09-24-8004389 | 09/24/2013 | Quality Control | Concrete | View | |
| 2013-09-24-10402962 | 09/24/2013 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
